What’s New in the 3 Valleys for 2019/20
With just over two months until the lifts open on 7 December, let’s take a look at what’s new for the coming season! New Lifts There has been a lot of work going on during the summer to improve the lifts in the 3 Valleys. The St Martin 1 Gondola has been upgraded increasing capacity by 30%, now able to move 2400 skier per hour. The runs from the top of the Meribel/St Martin Valley right down to St Martin are fabulous, and now you will be able to lap them much faster! The old